02 / ASSURANCEManufacturing and screening
EM, SS and MS use the same specified die, crystal and package construction for the ordered oscillator. The selections determine which finished-unit screening operations are added to the ERD manufacturing requirements.
EM
Engineering Model
ERD manufacturing requirements control materials, assembly, internal inspection, sealing and build records. The oscillator receives the outgoing checks specified for the ordered product.
Finished-unit SS and MS screening is added by selecting the corresponding model.
SS
Standard Screening
The finished-unit flow adds electrical checks, temperature cycling, frequency measurements at 1°C intervals across the ordered operating range, and fine and gross leak testing.
Powered burn-in and detailed test-data delivery are optional.
MS
Modified Screening
The SS operations are incorporated once, with 10 temperature cycles, 5,000 g constant acceleration in Y1, particle impact noise detection and at least 160 hours of powered burn-in.
Burn-in uses the ordered maximum operating ambient, nominal supply and specified load.
These ERD-tailored screening flows do not establish a radiation-performance rating, complete military conformance, qualification or QPL listing.